:: 3/4" plywood frame + cedar siderails

:: fitting the metal soil retention edging

:: some counterflashing with pond liner

:: dry-fitting the liner on edges

:: mechanically fastening on outside edging

:: finishing the box with cedar

:: after some fine-tuning - a perfect fit

:: still need to trim the fabric a bit , but close to done


:: roofline from opposite side

:: and some finish work on some doors - windows to come
Next weekend looks like planting, siding, windows and paint/stain - with an aim of chicken habitable by end of weekend/next week. Stay tuned. Read here for the previous posts on coop building, including design, week 1, week 2, and week 3 builds...